DOI Number :
Hits : 19

Beberapa Kriteria Pembebanan Optimum Ekonomi Alat-alat Pembangkitan Termis

Mak Sioe Tho,

Data & Software Engineering Research Group
STEI-ITB, Jl. Ganeca No.10, Bandung 40132, Indonesia
Email :


Abstract.

The method of loading and scheduling of parallel operating power plants for optimum economy has been fairly well developed. For small system where several generators are operating in  parallel and transmission losses can be neglected, simple criterions for economic scheduling and its limitation are discussed in this paper.



Keywords: electrotechnics

Download Article
 
Bahasa Indonesia | English
 
 
 

Notification:

Begin on 10 October 2014 this website is no longer activated for article process in Journal of Mathematical and Fundamental Sciences, Journal of Engineering and Technological Sciences, Journal of ICT Research and Applications and Journal of Visual Art and Design. The next process will be proceeded under new website at http://journals.itb.ac.id.

For detail information please contact us to: journal@lppm.itb.ac.id.

 
       
       
       ITB Journal Visitor Number #26586224       
       Jl. Tamansari 64, Bandung 40116, Indonesia Visitor IP Address #       
       Tel : +62-22-250 1759 ext. 121 © 2011 Institut Teknologi Bandung       
       Fax : +62-22-250 4010, +62-22-251 1215 XHTML + CSS + RSS       
       E-mail : journal@lppm.itb.ac.id or proceedings@lppm.itb.ac.id Developed by AVE